A mixed-model solar pump inverter order needs one confirmed specification row for each model and destination project. A total quantity such as “100 solar pump inverters” leaves voltage, input type, current rating and accessories unresolved. Use this purchase-order checklist after technical selection and quotation comparison, before the final order is confirmed.
Give every line an exact identity
Use an internal line number and project or stock reference. Copy the complete manufacturer model code from the accepted quotation, then record quantity, voltage class, phase and rated output current. Keep motor nameplate and site information attached to the relevant line. A kW value alone is not an approved substitute. If selection is incomplete, use the current-based sizing guide before placing the order.
A practical mixed-order matrix
| Field | What the confirmation should settle |
|---|---|
| Line and application | Unique line number, project/site or stock allocation |
| Equipment | Full model code, quantity, voltage/phase and output current |
| Supply arrangement | PV-only or approved hybrid arrangement; exact input capabilities |
| Options | Cabinet, sensors, monitoring hardware, cables and included/excluded items |
| Branding | Approved logo, model marking, label artwork and packaging revision if OEM applies |
| Commercial reference | Accepted quotation/proforma revision, currency, price and agreed payment stages |
| Delivery allocation | Named delivery basis/place, agreed shipment grouping, packing marks and consignee reference |
| Documents and support | Required manuals, inspection records, warranty scope and identified contact |
For IDEEI ranges, keep PV-fed S80 and hybrid S81 as distinct order lines. Do not use a series nickname to approve a different input arrangement. Confirm options against the exact model; monitoring or a complete outdoor cabinet should not be assumed from a product image.
Check quantities and options twice
Reconcile the sum of line quantities with the order total. Where an accessory is supplied per drive, per cabinet or per shipment, state that basis explicitly. Record a zero only when an item is intentionally excluded. For spare stock, identify the compatible model/revision instead of describing it only as “one spare board”.
A generic example is two line references, A and B, assigned to two separate project requirements. The labels A and B do not establish that the equipment is interchangeable; each needs its own confirmed specification. Do not combine their quantities into a single substitute model to simplify the paperwork.
Control changes after confirmation
- Issue a dated order matrix and retain the accepted quotation revision.
- Resolve every blank affecting model, option or shipment allocation.
- Record both parties’ confirmation of the final matrix through the agreed order process.
- If quantity, model, branding or destination changes, identify affected lines and request a revised price/schedule where needed.
- Keep the superseded revision for traceability and clearly identify the current one.
This checklist does not create new payment terms, a standard minimum order, OEM entitlement or a delivery promise. Use the written terms for the specific order. Any approved substitution should name the old and new model and the responsible technical confirmation.
Make the order usable at dispatch and receiving
Ask how carton marks and packing-list lines will map to the matrix. Where unit serial numbers become available at dispatch, request their association with the relevant line; do not invent serial numbers at the ordering stage. On arrival, use the receiving inspection checklist to check the delivery against this confirmed record.
Frequently asked questions
Can one line cover several powers?
Separate any items whose model or required specification differs. A clear subtotal can still group the lines commercially without removing their identities.
Should I approve OEM labels before manufacture?
Where OEM is part of the agreement, confirm the required artwork and approval stage in writing. This article does not set a universal production workflow or quantity threshold.
What should I send to IDEEI?
Send the line matrix, related motor/site data, quantities, required options and destination through IDEEI sales contact. Use the price and quotation scope guide to resolve missing commercial items first.
