An existing solar array can stay when its string layout and electrical limits fit the exact replacement drive and its condition is verified. Ask for a written match against the model number and voltage branch before ordering.
Prepare the three equipment records
Send the old drive nameplate, pump motor nameplate and module datasheet. Record modules in series per string, parallel strings per input and whether any strings have mixed panels or were rebuilt. A photo of the cabinet label cannot substitute for the actual string schedule.
Check the existing array against the replacement drive
| Check | Evidence for the supplier |
|---|---|
| Cold open-circuit voltage (Voc) | Use the module datasheet and site design temperature to compare corrected string Voc with the drive’s absolute DC maximum. |
| Hot operating voltage (Vmp) | Compare expected hot string Vmp with the model’s MPPT range. Check the start threshold separately. |
| Current and number of inputs | Compare operating and short-circuit current for each input with the published limits. Note any parallel strings. |
| Condition and motor fit | Ask a qualified installer to check the array’s condition, existing DC protection, and the motor’s voltage, phase and rated current. |
Record the decision in the replacement quote
Ask the supplier to mark the existing strings as reusable, requiring redesign, or pending more data. Ask for the model manual and the exact input limits cited in the decision. A similar power rating on the old and new drive leaves these checks open.
