Compare multi-pump VFD panel quotes on the same scope, control sequence, acceptance tests and service terms.
What belongs in a comparable RFQ?
Make the supply scope explicit
Share the same pump and motor schedules, supply details and site conditions with each bidder. Ask for an itemized list of drives, enclosure, controls, instrumentation, drawings and separately priced options.
Describe the expected control sequence
Describe how the pumps share demand, what should trigger duty-to-standby changeover, who supplies pressure feedback and which status or fault information the site needs. Ask for deviations in writing.
Compare acceptance and service terms
Use one quote sheet for factory and site acceptance checks, the documents and backups to be handed over, lead time and service terms. Request separate prices for optional items so the totals reflect the same scope.
| Quote line | Field to check |
|---|---|
| Base scope | Drives, enclosure, controls, documentation and supplier responsibilities |
| Control sequence | Demand sharing, standby start and signal ownership |
| Acceptance | Factory and site checks, records and lead time |
