FACTORY ONLINE — HAIYAN, ZHEJIANG
MON–SAT 8:30–17:30 (GMT+8) [email protected] WA +86 183 5724 1165
Get a Quote→ Contact
Home/News/Industrial VFD Applications

Constant-Pressure Pump VFDs: 4–20 mA Feedback

Constant-Pressure Pump VFDs: 4–20 mA Feedback

What must match before you buy?

For a constant-pressure pump, match the pressure transmitter’s measuring range and 4–20 mA output to the VFD’s supported current input and process PID function. Confirm the transmitter supply, loop arrangement and where the pressure is measured. Ask for the exact drive variant’s input documentation and a project-approved response to loss of signal.

What does a 0–10 bar sensor report at 12 mA?

For a linear transmitter configured for 4 mA at 0 bar and 20 mA at 10 bar, 12 mA corresponds to 5 bar. If the display shows another value, compare the configured engineering range, input mode and feedback source with the transmitter label and a reference gauge. The example illustrates scaling. The operating setpoint comes from the hydraulic design.

What should the supplier confirm in writing?

Send the pump nameplate, pipe pressure target at the measuring point, operating range, transmitter datasheet, control diagram and expected behavior on sensor loss. Ask who supplies the sensor and loop power, which terminal accepts current feedback, what minimum speed and protection are approved, and whether sleep or restart behavior suits the system.

What should be checked at handover?

Have qualified personnel verify the displayed pressure against a reference gauge at several operating points and document the approved response to a missing signal. Keep separate records for the pressure loop and local pump protections.

What should the panel do when pressure feedback is invalid?

Ask the panel supplier to document how the controller detects missing or invalid feedback and how it reports the event. Specify the expected drive and standby pump response, restart authority and any delay. Verify the agreed behavior during an acceptance test supervised by the responsible engineer. Pump VFD handover checklist.

Further reading

118 solar pump inverter · Solar pumping guide · Technical reference

Share this guide LinkedIn Facebook WhatsApp
RFQ — RESPONSE WITHIN 24 HOURS

Send the nameplate.
We size the drive.

Motor photo, pump curve or project spec — our engineers return a matched selection, wiring guidance and a parameter preset file.

MAIL ● [email protected] WA   ● +86 183 5724 1165 Get a Quote→ Send Inquiry